Glycol Dehydration Unit

Client: _________________________ Date: _________________________
Project: _________________________ Contact: _________________________
Location: _________________________ PSL Reference: _________________________

 

1. SITE CONDITIONS

Ambient Temperature: °F ____________________
Design Wind Speed - mph ____________________
Elevation - feet ASL ____________________

 

2. PROCESS DATA

2.1 Gas Composition

Component Mole % ____________________
N2 ____________________
CO2 ____________________
H2S ____________________
C1 ____________________
C2 ____________________
C3 ____________________
iC4 ____________________
nC4 ____________________
iC5 ____________________
nC5 ____________________
C6 ____________________
C7+ ____________________
TOTAL ____________________
Gas Molecular Weight: ____________________

 

2.2 Free Liquid Composition

Component Mole % ____________________
N2 ____________________
CO2 ____________________
H2S ____________________
C1 ____________________
C2 ____________________
C3 ____________________
iC4 ____________________
nC4 ____________________
iC5 ____________________
nC5 ____________________
C6 ____________________
C7+ ____________________
Gas Molecular Weight: ____________________

 

2.3 Flowrates

Gas:  
 
Minimum x MMSCFD ____________________
Maximum x MMSCFD ____________________
Normal x MMSCFD ____________________
 
 
Free Liquids:  
 
Minimum x BBL/D ____________________
Maximum x BBL/D ____________________
Normal x BBL/D ____________________
 
 
Free Water:  
 
Minimum x BBL/D ____________________
Maximum x BBL/D ____________________
Normal x BBL/D ____________________
 
 
Slug Volume: ft3 ____________________

 

2.4 Inlet Conditions

Operating Pressure:  
 
Minimum psig ____________________
Maximum psig ____________________
Normal psig ____________________
 
 
Operating Temperature: ____________________
Minimum °F ____________________
Maximum °F ____________________
Normal °F ____________________

 

3. PRODUCT DATA

3.1 Sales Gas

Water Content: #/MMSCF ____________________

 

4. MECHANICAL DATA

4.1 Design Conditions

Design  
Pressure (psig) ____________________
Temperature (°F) ____________________
   
Vessel Corrosion  
Allowance: inches ____________________
   
Piping Corrosion  
Allowance: inches ____________________

 

4.2 Instrumentation

Pneumatic Controls:
 
Yes/No ____________________
Instr. Air or Nat. Gas ____________________
Instr. Air ____________________
 
 
Electric Controls:
   
Yes/No ____________________
Voltage ____________________
 
 
Utilities Available:
 
Electric Power ____________________
Voltage ____________________
Phase ____________________
Cycle ____________________
 
 
Instrument Air:  
 
psig ____________________

 

4.3 Circulating Pump

Glycol Powered ____________________
Gas Powered ____________________
Electric Powered ____________________

 

4.4 Metering

4.4.1 Inlet Gas

Yes / No ____________________

 

4.4.2 Sales Gas

Yes / No ____________________
 
Oriface Fitting Type: ____________________
Orifice Flanges ____________________
Simplex ____________________
Quick Changer ____________________

 

4.4.3 Liquids

Yes / No ____________________
Local / Remote ____________________
 
Positive  
Displacement Meter ____________________
   
Turbine Meter  
c/w Totalizer ____________________
   
Specify if liquids are re-injected into gas outlet after metering: ____________________




| Home | About Propak | Stock Production Equipment | Engineering Services | Offices & Manufacturing Facilities |
| Propak Systems Worldwide | Fabrication | Turnkey Projects | Products & Field Services | Inquiry Spec Sheets |
| Technical Publications | Careers at Propak | Contact Propak |



Copyright © 2000 "Propak Sytems Ltd". All rights reserved.
This web site designed by 'theWORLDco'.