Refrigeration Inquiry Specifications

Client: _________________________ Date: _________________________
Project: _________________________ Contact: _________________________
Location: _________________________ PSL Reference: _________________________

 

1. PROCESS DATA
 
1.1 Gas Flowrate
 

Source:

____________________
 
Maximum - MMSCFD ____________________
Minimum - MMSCFD ____________________
 
 
1.2 Inlet Free Liquids
 

Source:

____________________
 
HC - Bbl/MMSCF ____________________
H2O - Bbl/MMSCF ____________________
 
 
1.3 Inlet Pressure
 
Maximum - psig ____________________
Minimum - psig ____________________
 
 
1.4 Inlet Temperature
 
Maximum - °F ____________________
Minimum - °F ____________________
 
 
1.5 Gas Composition
 
Component Mole % ____________________
He ____________________
N2 ____________________
CO2 ____________________
H2S ____________________
C1 ____________________
C2 ____________________
C3 ____________________
iC4 ____________________
nC4 ____________________
iC5 ____________________
nC5 ____________________
C6 ____________________
C7 ____________________
C8+ ____________________
TOTAL ____________________
 
 
1.6 Liquid Composition
 
Gas Molecular Weight: ____________________
He ____________________
N2 ____________________
CO2 ____________________
H2S ____________________
C1 ____________________
C2 ____________________
C3 ____________________
iC4 ____________________
nC4 ____________________
iC5 ____________________
nC5 ____________________
C6 ____________________
C7 ____________________
C8+ ____________________
TOTAL ____________________
 
 
1.7 Compression Upstream
 

Yes/No

____________________
 
 
1.8 Outlet Pressure
 

Pipeline: psig

____________________
 
 
1.9 Ambient Temperature
 
Maximum - °F ____________________
Minimum - °F ____________________
 
 
1.10 Plant Purpose
 
Maximize Liquids ____________________
H.C. Dewpoint Control ____________________
 
 
 
2. PRODUCT DATA
 
2.1 Sales Gas
 
H.C. Dewpoint Required ____________________
°F ____________________
at - psig ____________________
Water Content: ____________________
pounds/MMSCF ____________________
 
 
Heating Value
 
BTU/SCF ____________________
Net ____________________
Wet ____________________
Gross ____________________
Dry ____________________
 
 
2.2 Liquid Product Required
 
Stabilized Condensate ____________________
(C5+) ____________________
RVP Require ____________________
LPG Mix (C3+) ____________________
Fractionation ____________________
(Attach Specifications) ____________________
 
 
2.3 Residue Gas (Off Tower)
 

Recycle To:

____________________
 
Inlet ____________________
Sales ____________________
 
 

Send To:

____________________
 
Flare ____________________
Vent ____________________
 
 
3. MECHANICAL DATA
 
3.1 Plant Design Pressure
 

psig

____________________
 
 
3.2 Corrosion Allowance
 

inches

____________________
 
 
3.3 Power Available
 
Yes/No ____________________
Voltage Maximum ____________________
Phases ____________________
Cycles: Hertz ____________________
 
 
3.4 Controls
Pneumatic ____________________
Electric ____________________
Panel - Local/Remote ____________________
 
 
3.5 Alarms
Transmission (Remote) ____________________
Gas Detection ____________________
Local Alarm ____________________
Fire Detection ____________________
 
 
3.6 Metering
 
Sales Gas ____________________
Recycle Gas ____________________
Inlet Gas ____________________
Liquid Product ____________________
Flare Volume ____________________
 
 
3.7 Heating System (Process)
Direct Fired Reboilers ____________________
Heating Fluid ____________________
Indirect System ____________________
Mounted On Skid ____________________
Mounted Off Skid ____________________
Other ____________________
 
 
3.8 Building Required
 

Yes/No

____________________
 
 
3.9 Storage
 
C5+ Atmos. - Tank ____________________
# Days/Bbl's ____________________
 
C3+ LGP Bullet ____________________
# Days/Bbl's ____________________




| Home | About Propak | Stock Production Equipment | Engineering Services | Offices & Manufacturing Facilities |
| Propak Systems Worldwide | Fabrication | Turnkey Projects | Products & Field Services | Inquiry Spec Sheets |
| Technical Publications | Careers at Propak | Contact Propak |



Copyright © 2000 "Propak Sytems Ltd". All rights reserved.
This web site designed by 'theWORLDco'.