Sulphur Recovery Unit Inquiry Specifications

Client: _________________________ Date: _________________________
Project: _________________________ Contact: _________________________
Location: _________________________ PSL Reference: _________________________

 

1. PROCESS DATA
 
1.1 Gas Flowrate
 

Source:

____________________
 
Maximum - MMSCFD ____________________
Minimum - MMSCFD ____________________
 
1.2 Inlet Pressure
 
Maximum - psig ____________________
Minimum - psig ____________________
 
 
1.3 Inlet Temperature
 
Maximum - °F ____________________
Minimum - °F ____________________
 
 
1.4 Gas Composition
 
Component Mole % ____________________
He ____________________
N2 ____________________
CO2 ____________________
H2S ____________________
C1 ____________________
C2 ____________________
C3 ____________________
iC4 ____________________
nC4 ____________________
iC5 ____________________
nC5 ____________________
C6 ____________________
C7 ____________________
C8+ ____________________
TOTAL ____________________
 
 
1.5 Ambient Temperature
 
Maximum - °F ____________________
Minimum - °F ____________________
 
 
1.6 Required Sulphur Recovery
 
3 Stage Claus - 96% ____________________
"Super Claus" - 99% ____________________
Tail Gas Unit "Scot" 99.9 ____________________
 
 
2. PRODUCT DATA
 
2.1 Sulphur
 
Sulphur Pit
 
Days of Storage ____________________
Sulphur Block Yes/No ____________________
Pellitizer Yes/No ____________________
 
 
3. MECHANICAL DATA
 
3.1 Plant Design Pressure
 

psig

____________________
 
 
3.2 Corrosion Allowance
 

inches

____________________
 
 
3.3 Power Available
 
Yes/No ____________________
Voltage Maximum ____________________
Phases ____________________
Cycles: Hertz ____________________
 
 
3.4 Controls
 
Pneumatic ____________________
Electric ____________________
 
 
3.5 Alarms
 
Local Panel Yes/No ____________________
Remote Panel Yes/No ____________________
H2S Detection ____________________
Gas Detection ____________________
Fire Detection ____________________
 
 
3.6 Metering
 
Acid Gas ____________________
Other ____________________
Local or Remote ____________________
 
 
3.7 Heating System (Process)
 
Glycol Exchanger ____________________
Steam - HP ____________________
Steam - LP ____________________
 
 
3.8 Winterizing
 

Building Yes/No

____________________

Heat Tracing Yes/No

____________________
 
 
3.9 Fire Suppression
Fire Water ____________________
Chemical ____________________




| Home | About Propak | Stock Production Equipment | Engineering Services | Offices & Manufacturing Facilities |
| Propak Systems Worldwide | Fabrication | Turnkey Projects | Products & Field Services | Inquiry Spec Sheets |
| Technical Publications | Careers at Propak | Contact Propak |



Copyright © 2000 "Propak Sytems Ltd". All rights reserved.
This web site designed by 'theWORLDco'.