Project Description
A 280 MMSCFD Cryogenic Turbo Expander Plant (expandable to 425 MMSCFD), operating at –80ºC it is designed to recover LPG at 98% propane recovery. The major process equipment includes: Inlet Separation and Slug Catcher, three (3) tower Molecular Sieve Dehydration Unit, Mercury Removal Unit, a multi-core Brazed Aluminum Heat Exchanger, 5100 HP (3810 kW) Turbo Expander, Deethanizer Unit, Debutanizer Fractionation Unit for 9500 BBL/D C3/C4 LPG and 2400 BBL/D C5+ gasoline products, LPG Product Storage and LPG Export Pumping Unit, two (2) 8600 HP (6440 kW) turbine drive multi-stage centrifugal Residue Gas Compressor Packages, 60,000,000 Btu/hr Hot Oil Heater and Heat Medium System, 565 MMSCFD Horizontal Flare System, Fuel Gas System, Utility Systems, Fire Protection System, and DCS Control System.
Type of Contract
Completion Date
Fractionation Towers leaving Port of Ushuaia, Argentina
|
|
 |